CUSTOMER: Elizabeth Davies

LOCATION:

BUDGET: £15,000

TOTAL COST: £13,500

RANGE USED: Lugano

PROJECT DURATION: 3 weeks

ABOUT THE PROJECT

The completed kitchen renovation transformed the outdated kitchen into a sleek, functional space. Mrs Davies desired a modern, easy-to-maintain kitchen with more storage and worktop space for her cooking and baking, especially with her grandchildren. To achieve this, she chose the Lugano Gloss Painted Range in Ivory with grey laminate worktops, which provides a clean and contemporary look.

The project also involved replacing the tiled flooring in the kitchen, utility room, and toilet with durable and easy-to-maintain Luxury Vinyl flooring, which offered a practical and stylish upgrade. A sleek new Franke sink and tap were installed, while Mrs Davies retained her existing double oven and provided her own gas hob, allowing her to personalise the modernised space.

ABOUT THE PROJECT

The completed kitchen renovation transformed the outdated kitchen into a sleek, functional space. Mrs Davies desired a modern, easy-to-maintain kitchen with more storage and worktop space for her cooking and baking, especially with her grandchildren. To achieve this, she chose the Lugano Gloss Painted Range in Ivory with grey laminate worktops, which provides a clean and contemporary look.

The project also involved replacing the tiled flooring in the kitchen, utility room, and toilet with durable and easy-to-maintain Luxury Vinyl flooring, which offered a practical and stylish upgrade. A sleek new Franke sink and tap were installed, while Mrs Davies retained her existing double oven and provided her own gas hob, allowing her to personalise the modernised space.

The Process & The Kitchen Design & Build In Progress

The project started by completely removing the outdated kitchen and ceiling, including the tiled flooring and wall tiles that extended into the utility room. The subfloor was then levelled to prepare for the new flooring, creating a smooth and even base for installing the Luxury Vinyl Tile (LVT).

Following this, the team completed a kitchen rewire, incorporating modern spotlights, under-cabinet lighting and upgraded sockets and switches to improve functionality and convenience. Once the walls and ceiling were replastered, the plumbing was reconfigured to accommodate the sink’s repositioning. The final stage involved the installation of sleek new kitchen units, worktops, and bespoke splashback panels tailored to Mrs Davies’ preference for a design inspired by a previous project completed by the team.

The renovation was completed seamlessly, with clear and consistent communication throughout. This ensured Mrs Davies’ vision and satisfaction were prioritised at every step.

The Process & The Kitchen Design & Build In Progress

The project started by completely removing the outdated kitchen and ceiling, including the tiled flooring and wall tiles that extended into the utility room. The subfloor was then levelled to prepare for the new flooring, creating a smooth and even base for installing the Luxury Vinyl Tile (LVT).

Following this, the team completed a kitchen rewire, incorporating modern spotlights, under-cabinet lighting and upgraded sockets and switches to improve functionality and convenience. Once the walls and ceiling were replastered, the plumbing was reconfigured to accommodate the sink’s repositioning. The final stage involved the installation of sleek new kitchen units, worktops, and bespoke splashback panels tailored to Mrs Davies’ preference for a design inspired by a previous project completed by the team.

The renovation was completed seamlessly, with clear and consistent communication throughout. This ensured Mrs Davies’ vision and satisfaction were prioritised at every step.

THE RESULTS

The renovation resulted in a bright, contemporary kitchen tailored to Mrs Davis’ needs, offering significantly enhanced storage and worktop space, which was a priority. She was particularly delighted with the additional cupboard space, the sleek, clean appearance of the splashback panels, and the spacious, well-thought-out kitchen layout. Removing the false ceiling further contributed to the room's open and airy atmosphere.

This kitchen transformation is a prime example of how an outdated kitchen can be transformed into a stylish and highly functional space designed to suit the client's lifestyle. Completed with a project budget of £15,000, the team delivered a top-quality renovation on time, providing Mrs Davies with a beautiful and practical kitchen she can enjoy for many years to come.

THE RESULTS

The renovation resulted in a bright, contemporary kitchen tailored to Mrs Davis’ needs, offering significantly enhanced storage and worktop space, which was a priority. She was particularly delighted with the additional cupboard space, the sleek, clean appearance of the splashback panels, and the spacious, well-thought-out kitchen layout. Removing the false ceiling further contributed to the room's open and airy atmosphere.

This kitchen transformation is a prime example of how an outdated kitchen can be transformed into a stylish and highly functional space designed to suit the client's lifestyle. Completed with a project budget of £15,000, the team delivered a top-quality renovation on time, providing Mrs Davies with a beautiful and practical kitchen she can enjoy for many years to come.

"We had our kitchen completely removed, along with the false ceiling and tiled floors. The team were professional, tidy, and very clear in explaining the process and timescales. The result is a bright, easy-to-clean kitchen with plenty of storage. I’m thrilled with the outcome and would highly recommend it."

- Elizabeth Davies

BOOK YOUR HOME VISIT

SURVEY.

Let’s get started on your dream kitchen today.

© Copyright 2025. Lingard Interiors. All Rights Reserved.

DOWNLOAD OUR BROCHURE

View our kitchen ranges